Real drawings, models and site evidence from Engin’s work and Ben’s earlier contractor experience.

Explore the work ↓
Inside the project files32 seconds / Silent film
Real drawings, models and site photographs, brought into motion. Includes Ben’s earlier work at Indoor Climate Systems.
Read the film

Design. Detail. Delivery. Real records. Practical engineering.

  • City Point, London, Level 8 (2023). Make the existing work. Mechanical contractor design; model excerpt from Ben’s earlier work with Indoor Climate Systems.
  • Pernod Ricard, Chiswick, Levels 7–9 (2020). Connect the detail. Record drawings and handover from Ben’s earlier work with Indoor Climate Systems.
  • Orsett Hall Hotel & Spa (2026). Define the next stage. Engin Services MEP tender design; architectural background by ADS Design.
  • London office investigation (2025). Get closer to the problem. An anonymised condition-survey photograph, site evidence and proposed remedial scope.

M&E design that works on site. Talk to Ben at enginservices.co.uk.

Heating and cooling zones in Engin’s Orsett Hall ground-floor tender mark-up
Excerpt: Engin Services heating and cooling tender mark-up, T01, July 2026. Architectural background: ADS Design. Not for construction.
View detail
Engin Services / Hotel & spa / 2026

Orsett Hall Hotel & Spa

Defining the MEP scope around a phased refurbishment and retained services.

The brief
Develop a mechanical, electrical and public health tender package for a hotel remaining partly operational.
The work
Engin’s package includes particular and reference specifications, design schedules and service mark-ups, addressing plant, controls, commissioning and interfaces.
The output
A set of tender documents defining the design basis and contractor responsibilities. Detailed Stage 4 design remains a contractor requirement in this issue.
Explore M&E design support ↗
Three-dimensional Hevacomp model from the City Point Level 8 mechanical contractor design proposal
Excerpt: Level 8 City Point mechanical contractor design proposal, March 2023. Ben’s earlier work with Indoor Climate Systems.
View detail
Earlier contractor experience / London / 2023

City Point, Level 8

Adapting existing mechanical services to a new office fit-out.

The brief
Develop the contractor’s mechanical design around retained heating, cooling and ventilation systems and a changed room layout.
The work
The proposal sets out system modifications, room-by-room heating and cooling calculations, fan-coil requirements and public health services.
The output
A mechanical contractor design proposal explaining the design basis, calculations and proposed installation scope for design-team review.

Delivered while Ben worked with Indoor Climate Systems; included here as his prior experience.

Explore contractor design support ↗
Detail of fan-coil units and ductwork from the Pernod Ricard Level 8 mechanical record drawing
Excerpt: Level 8 mechanical record drawing, September 2020. Indoor Climate Systems project archive; Ben’s earlier contractor experience.
View detail
Earlier contractor experience / Chiswick / 2020

Pernod Ricard

Mechanical services from fit-out design to handover records.

The project
Office fit-out across Levels 7, 8 and 9 at Chiswick Business Park, with new and retained mechanical services.
The evidence
The project archive includes mechanical record drawings, an asset register, operating and maintenance information and commissioning records.
The detail
Fan-coil and ductwork modifications, cooling, domestic water and drainage are brought together in the handover package.

Ben’s earlier project experience with Indoor Climate Systems. The excerpt is a team-produced project record.

Explore construction support ↗
Existing heating pipework and connections recorded during an office condition survey
Site photograph from the July 2025 mechanical condition survey. Client and building details withheld.
View detail
Site investigation / London / 2025

Understand the condition.
Define the next step.

An evidence-led review of existing heating pipework.

The brief
Investigate reported deterioration and establish a clearer picture of the existing installation.
The work
Review risers, distribution pipework and fan-coil connections; record site observations and distinguish affected areas from the sections inspected in better condition.
The output
A photographic survey report with findings and a proposed phased remedial scope to inform the project team’s next decisions.
Explore fault finding ↗

Project detail

A project, a problem, a next step

Put your project
in front of Ben.

Tell me what you are building, where the information stops and what your team needs next.

Discuss your project

07715 481 288
ben@enginservices.co.uk

Call BenDiscuss your project