Stage 3 received.
What’s missing?
An M&E design handover checklist for the gap between winning the project and developing the technical design.
12 checks · No sign-up · Keep your review as a spreadsheet
≠ all the answers.
Responsibilities.
Next issue.
Use this before appointing design support. Record the information you have, flag the gaps and identify the next decisions. Expand a check to add a reference or action. A recorded document still needs the appropriate technical review.
Agree the work.
Then develop it.
RIBA Stage 3 concerns spatial coordination; Stage 4 develops the technical design needed for manufacture and construction. These stages can overlap with the construction programme. The project appointment defines the actual responsibilities and outputs.
This is Engin’s original scoping checklist, not a reproduction of a RIBA or BSRIA form. Adapt it with the appointed project team; it is not an exhaustive design or compliance review.
Explore contractor design support ↗Free to use on your projects.
Share the public page or download the spreadsheet. You can adapt the checklist for your own project review. Please retain the source and version so colleagues can find the current guidance.
Sources and version
Engin Services · Version 1.0 · 3 October 2026. Prepared with AI assistance and source checks; not an institutional endorsement.
- RIBA Plan of Work 2020 — project stages and information exchanges.
- BSRIA BG 6: A Design Framework for Building Services — framework for allocating design responsibilities and outputs.
Our editorial approach. Send corrections or feedback to Ben.
Put your project
in front of Ben.
Tell me what you are building, where the information stops and what your team needs next.